Subway service began on December 17, 2017, and GO Train service began on December 30, 2017.




Here are some pictures taken months after the 'grand opening' so a lot of the outside shots will most likely become outdated as the station will continue to change in the development towards the support of both Downsview Park and the Keele Industrial area north of Sheppard Avenue West.

Bakersfield Street will be extended to provide vehicle access to the west side of the station. The TTC subway station is centred under the CN/GO Rail line to provide better integration between transit modes and to make room for transit oriented development. GO Transit has committed to cost sharing for this fully-integrated, multi-modal transit facility.
The development potential of Parc Downsview Park is maximized by locating a significant portion of the station in the 30-metre strip on either side of the CN/GO right-of-way that is not available for development.
Entrance pavilions are located on both sides of the CN/GO Rail line with access for pedestrians on footpaths adjacent to maintenance and emergency response access routes. A maintenance driveway extends from the Bakersfield Street and Sheppard Avenue West intersection, allowing for access to the Bakersfield substation that is integrated with the west pavilion. The east pavilion contains both TTC spaces and GO Transit ticketing spaces.The station is located to allow transit oriented development to build up to a more urban nature in the future, with the design of the TTC station meeting height limitation requirements for the Downsview Airport.
Entrance pavilions are located on both sides of the CN/GO Rail line with access for pedestrians on footpaths adjacent to maintenance and emergency response access routes. A maintenance driveway extends from the Bakersfield Street and Sheppard Avenue West intersection, allowing for access to the Bakersfield substation that is integrated with the west pavilion. The east pavilion contains both TTC spaces and GO Transit ticketing spaces.The station is located to allow transit oriented development to build up to a more urban nature in the future, with the design of the TTC station meeting height limitation requirements for the Downsview Airport.